A system-led supply-and-install approach
Car park waterproofing is a complete system of field membrane, traffic protection and interfaces. Coating the open deck alone will not resolve failed joints or unsuitable drainage, so these details form part of the assessment.
What shapes the specification?
- Source and route of water ingress
- Joints, outlets and penetrations
- Movement and traffic protection
Typical installation scope
The final scope is confirmed against the site condition, selected system and agreed programme.
- Deck preparation
- Compatible waterproofing layers
- Agreed junction and drainage details
Planning the work
We consider the project location, access, preparation requirements, application conditions and the time needed before reopening. On operational car parks, the brief should identify areas that can close and routes that need to remain available.
Frequently asked questions
Will coating the deck surface stop every leak?
Not necessarily. Water can bypass the surface through failed joints, drains, penetrations or adjoining construction. Establish the leakage route and detail the interfaces as part of the waterproofing scope.
Can you quote from plans and photographs?
Plans, photographs and approximate deck areas can support an initial assessment. A firm scope may require a site survey, substrate tests or further investigation.
How long will the car park need to close?
The closure depends on preparation, repairs, system choice, weather and curing requirements. Return-to-service timing is agreed for the specific installation.
Do you supply and install in the UK and Europe?
UK and European projects can be considered on a supply-and-install basis. We confirm delivery feasibility, local requirements and the programme during the enquiry stage.
Technical guides for this service
Related services
Top Deck Car Park Waterproofing
Crack-Bridging Car Park Deck Systems
Concrete Repairs for Car Parks
Establish the route of water before selecting the finish
A waterproofing survey should connect the reported leak below with the deck above. We consider whether water is entering through the main slab, a construction or movement joint, an outlet, an upstand or a penetration. The brief should identify the affected levels and include photographs of the wet area and the corresponding deck surface.
Agree interfaces and preparation as part of the scope
The proposal should identify how the waterproofing layer connects to movement joints, drainage and adjoining construction. Existing coatings, repairs and contamination need to be assessed before the preparation method and compatible primer are selected. Slab condition and the selected system determine the testing required; the coating finish alone is not the complete waterproofing detail.
Traffic protection and handover
The membrane, wearing layer and surface texture must be considered together for parking bays, turning areas, ramps and pedestrian routes. Before installation, agree the work boundaries, inspection points, curing conditions and reopening sequence. For an exposed upper level, use our separate top deck waterproofing guide to consider weather exposure, falls and outlet detailing.
Preparation and operational project evidence
At Gatwick South Terminal, Ecoflor refurbished 9,500 m² across three parking areas using a flexible polyurethane intermediate deck system. The published case study records coating removal, diamond grinding with HEPA filtration and work alongside operational parking levels. It provides evidence of preparation and access planning; the waterproofing specification for an exposed deck must be assessed separately.