
Case study: Union House, Tunbridge Wells — 3,000 m²
Case study: Cityscape Aldgate basement flooring
Plan around the way your car park operates
Balance resident access with planned closures. Basement moisture, suspended deck movement and the position of occupied areas below influence system selection.
Resident access
Record allocated bays, entry systems and agreed vehicle relocation arrangements. Give the project team a clear phase plan and reopening criteria for each area.
Basement and occupied areas
Assess moisture and ventilation in basement garages. For suspended decks above occupied spaces, investigate water ingress and detail waterproofing interfaces as part of the scope.
Define the deck requirements
Record exposed and sheltered areas, structural movement, moisture, visible defects and traffic routes. We use this brief to identify a suitable coating approach and practical installation scope.
Coordinate access and phasing
Set out closure windows, retained access, nearby occupied areas and the approved marking layout before the installation programme is agreed.

Services for your project
Multi-Storey Car Park Coatings
Top Deck Car Park Waterproofing