
A system-led supply-and-install approach
A deck coating must balance wear resistance, surface texture and movement accommodation. Our supply-and-install approach brings preparation, coating layers and junction detailing into a single planned scope.
What shapes the specification?
- Deck movement and crack assessment
- Waterproofing requirements
- Drainage, falls and junctions
Typical installation scope
The final scope is confirmed against the site condition, selected system and agreed programme.
- Substrate assessment
- Specified coating build-up
- Joints, drainage details and markings
Planning the work
We consider the project location, access, preparation requirements, application conditions and the time needed before reopening. On operational car parks, the brief should identify areas that can close and routes that need to remain available.

Frequently asked questions
How are deck coatings different from floor paint?
A specified deck coating addresses the deck’s traffic and protection requirements as a complete layered system. A basic floor paint should not be assumed to provide waterproofing or crack-bridging performance.
Can you quote from plans and photographs?
Plans, photographs and approximate deck areas can support an initial assessment. A firm scope may require a site survey, substrate tests or further investigation.
How long will the car park need to close?
The closure depends on preparation, repairs, system choice, weather and curing requirements. Return-to-service timing is agreed for the specific installation.
Do you supply and install in the UK and Europe?
UK and European projects can be considered on a supply-and-install basis. We confirm delivery feasibility, local requirements and the programme during the enquiry stage.
Technical guides for this service
Related services
Top Deck Car Park Waterproofing